London Summer Olympics 2012 Venue and Infrastructure


The 2012 Olympic and Paralympic Games will use a mixture of new venues, existing and historic facilities, and temporary facilities, some of them in well-known locations such as Hyde Park and Horse Guards Parade. Some of the new facilities will be reused in their Olympic form, while others will be resized or relocated.
The majority of venues have been divided into three zones within Greater London: the Olympic Zone, the River Zone and the Central Zone. In addition to these are those venues that, by necessity, are outside the boundaries of Greater London, such as the Weymouth and Portland National Sailing Academy on the Isle of Portland in Dorset, which will host the sailing events, some 125 miles (200 km) southwest of London. The football tournament will be staged at several grounds around the UK. Work began on the Park in December 2006, when a sports hall in Eton Manor was pulled down. The athletes' village in Portland was completed in September 2011.
In November 2004 the 500-acre Olympic Park plans were revealed. The plans for the site were approved in September 2004 by Tower Hamlets, Newham, Hackney and Waltham Forest. The redevelopment of the area to build the Olympic Park required compulsory purchase orders of property. The London Development Agency was in dispute with London and Continental Railways about the orders in November 2005. The LCR accused the LDA of killing off development in the area. The LDA planned to buy land alongside the Olympic Park for the Stratford City development project, bringing the 180-acre site of the former Stratford Rail Lands into a mixed-use development, including 4,500 new homes, office space, hotels and shops. This resulted in 2011 with the completion of the largest urban shopping centre in Europe being operated by Westfield. By May 2006, 86% of the land had been bought as businesses fought eviction; this led to an enquiry being set up. 206 companies had to relocate by July 2007. In addition, residents who opposed the eviction tried to find way to stop it by setting up campaigns. However they had to leave as 94% of land was bought and the other 6% bought as a £9 billion regeneration project started.
Aerial view of the Olympic Park in April 2012
However, there were some issues with the original venues not being challenging enough or being financially unviable. For example, the road racing at the Olympic Games was originally scheduled to take place in Regent's Park and on Hampstead Heath. Instead the Olympic road races will start and finish on The Mall in central London, extend into Surrey to the south and include loops around Box Hill. The Olympic mountain bike event will take place at Hadleigh Farm after the event was moved from Weald Country Park, after the UCI labelled the course at the park "too easy" in July 2008. A location in Kent was also considered.
The Olympic marathon course, which was set to finish in the Olympic stadium, was moved to The Mall. The idea angered some members of the local community, who said they had been left out of the Olympics as no events would take place in the boroughs. The change was made as closing Tower Bridge would cause gridlock in central London. North Greenwich Arena 2 was scrapped in a cost-cutting exercise, Wembley Arena being used for badminton and rhythmic gymnastics events instead.

Public transport

The Olympic Javelin service runs between St Pancras and Ebbsfleet, viaStratford
London's public transport was an element of the bid which was scored poorly in the IOC's initial evaluation; however, they felt that if the improvements were delivered in time for the Games then London would cope. Transport for London (TfL) carried out numerous improvements in preparation for 2012, including the expansion of the London Overground's East London Line, upgrades to the Docklands Light Railway and the North London Line, and the introduction of a new "Javelin" high-speed rail service, using the Hitachi Corporation's "bullet" trains. The platforms at Stratford International station(which are at a height designed for Eurostar trains) will be temporarily raised to accommodate the Javelin trains. According to Network Rail, an additional 4,000 train services will run during the Games, and train operators will put on longer trains during the day.
During the Games, Stratford International station will not be served by any international services as Eurostar services will pass through the station without stopping. Passengers must change at London St Pancras and travel out to Stratford with the Javelin service to reach the Olympic Park. TfL have also announced that westbound trains will not stop at Hackney Wick railway stationPudding Mill Lane DLR station, which is located within the boundary of the Olympic Park, will close entirely during the Games.
The Emirates Air Line crosses the River Thames between Greenwich Peninsula and the Royal Docks
TfL has also built a £25 million cable car across the River Thames, the Emirates Air Line, to link 2012 Olympics venues. It was inaugurated in June 2012 and crosses the Thames between Greenwich Peninsula and the Royal Docks, carrying up to 2,500 passengers an hour at a heights above 50 metres (160 ft) in the air. It is designed to cut journey times between the O2 arena and the ExCel exhibition centre – both of which are Olympic locations. The system could provide a crossing every 30 seconds.
The plan is to have 80% of athletes travel less than 20 minutes to their event and to have 93% of athletes within 30 minutes of their event. The Olympic Park would be served by ten separate railway lines with a combined capacity of 240,000 passengers per hour. In addition, the LOCOG planned for 90% of the venues to be served by three or more types of public transport.[64] Two park-and-ride sites were off the M25 with a combined capacity of 12,000 cars 25 minutes away from the Olympic Park. Another park-and-ride site was planned in Ebbsfleet which would have capacity for 9,000 cars where spectators could board a 10-minute shuttle bus. To get spectators to Eton Dorney, four park-and-ride schemes were set up. Spectators would be dropped off at Windsor Racecourse with a bridge going over the Thames linking the racecourse to the rowing venue.
Some lanes on some roads in London will be dedicated to athletes, officials and VIPs.
Concerns have been expressed at the logistics of spectators travelling to the events outside London. In particular, the sailing events at Portland are in an area without direct motorway connections, and with local roads that are heavily congested by tourist traffic in the summer. However, the Weymouth area did undergo a major upgrade to its road infrastructure. A £77 million relief road connecting Weymouth to Dorchester was built and opened in 2011. Some £16 million was put aside for the rest of the improvements. In addition the plans removed five roundabouts to ease congestion and replaced them with traffic lights. But some residents were unhappy that the roundabouts were removed.
FirstGroup will provide the venue shuttle and park-and-ride services, services connecting peripheral park-and-ride sites on the M25 with the Olympic Park and Ebbsfleet, and a nationwide network of express coaches to the Olympic Park and the Weymouth and Portland sailing venue. The services will require around 900 vehicles in total, although some will be sub-contracted.
TfL have published information to encourage cycling as a mode of transport during the Games. Cyclists, like motorists, are not permitted to ride in the designated Olympic Lanes on London streets. Some designated cycle paths such as the Lea Valley towpath are closed to the public during the Olympics.